West Connex Interchange

Client: CPB Dragados Samsung Joint Venture (CDSJV)

Project Value: $3 Million

KEY FEATURES

  • Haul Road Earthworks
  • Slope Stabilisation Works
  • Site Remediation & Onsite Contaminated Soil Treatment Works
  • All earthworks to form the tunnel access road, tunnel portal, spoil shed pad, site office and car park
  • All slope stabilisation required on the rock face to the north of and immediately adjacent to the access road and tunnel portal location.
  • 50,000m3 of earthworks.
  • 6,300m of soil nails installed.
  • 2,100m2 of shotcrete installed.
  • Onsite treatment, encapsulation and partial removal of friable asbestos contaminated soils.