SACL Taxiway B4C

Client: Sydney Airport Corporation Limited (SACL)

The Taxiway B4 and C Realignment Works was the first stage associated with the Sydney International Airport Terminal T2 Pier Expansion. To ensure successful continued aircraft movements and airfield operations, works were required to be staged during curfew hours including full reinstatement of critical work areas at the completion of each work period.

Works consisted of the construction of new Flexible Taxiway Pavements, protection of existing Fuel Line assets with high strength Rigid Pavement, new hydraulic services and adjustments to existing infrastructure, Stormwater construction, Airfield Ground Lighting (AGL) and Movement Area Guidance Signs (MAGS).

KEY FEATURES  

  • Construction works within secure Airside area
  • Demolition of existing taxiway pavements
  • Bulk Excavation
  • Flexible Taxiway Pavement construction
  • Buried Fuel Line service protection
  • Hydraulic service works
  • Stormwater construction
  • Airfield Ground Lighting
  • Movement Area Guidance Signs