Potts Point Tunnel & Bulk
Client: Bezzina Developments
Project Value: $1.5 Million
Sensitive Demolition and Excavation works within a residential neighbourhood, with no disruption to the amenity of the surrounding residents. This project included asbestos removal, as well as general site clearance (the removal of a number of mature trees) as well as a horizontal tunnel excavated from within the site footprint via horizontal line drilling.
KEY FEATURES
- Demolition
- Asbestos removal
- Bulk Excavation
- suspended reinforced concrete road slab
- Shotcrete walls
- Temporary anchors
- Tunnel excavation within bulk footprint