Potts Point Tunnel & Bulk

Client: Bezzina Developments

Project Value: $1.5 Million

Sensitive Demolition and Excavation works within a residential neighbourhood, with no disruption to the amenity of the surrounding residents. This project included asbestos removal, as well as general site clearance (the removal of a number of mature trees) as well as a horizontal tunnel excavated from within the site footprint via horizontal line drilling.

KEY FEATURES  

  • Demolition
  • Asbestos removal
  • Bulk Excavation
  • suspended reinforced concrete road slab
  • Shotcrete walls
  • Temporary anchors
  • Tunnel excavation within bulk footprint