Barangaroo – Early Works & Remediation
Client: Lend Lease
Project Value: $12 Million
Works to this sensitive site in the heart of Darling Harbour included provisions for strict pedestrian and traffic management. Enabling structures / pavements were constructed to facilitate further construction works to the Barangaroo Site, including construction of Diaphragm walls, and anchor platforms installed to site perimeter.
KEY FEATURES
- Set-up of temporary passenger terminal
- Installation of enabling structures (wheel washes, entry driveways, temporary services trenches, fencing etc.)
- Removal of spoil from piling and diaphragm wall excavation
- Removal of contaminated soils
- Asbestos removal and remediation works
- Decontamination set-ups for contaminated materials handling
- Trimming to Diaphragm Wall
- Surfacing to Diaphragm Wall
- Installation of anchor platform to perimeter of site
- Archaeological investigation works
Early Works Stage 1a:
- Spoil management and waste treatment for stage 1a Basement perimeter retention wall
- Asbestos management and monitoring
- Decom supply and hygiene management for above and associated piling and diaphragm wall works
- Materials waste classification and tracking for spoil removal from site
- Stormwater installation in asbestos impacted soils
Stage 1b:
- Infrastructure and slabs for various air and water treatment facilities for menard bachy
- Asbestos removal
- Decom supply and hygiene management
- Water treatment pipe line installation
- Water treatment slab and wall construction