100 Harris Street Bulk

Client: Peloton Constructions P/L

Project Value: $2.85 Million

KEY FEATURES

  • Elevation change between two frontages of 10m in height
  • Boundary shoring works including piling and shotcrete including bar projection to future slab
  • Demolition of surface asphalt/concrete
  • Vibration monitoring and consideration with working next to Ausgrid substation
  • Bulk Excavation in OTR (4,000 m3) and sandstone (4,000 m3)
  • Staged excavation and coordination with builder utilising sole entranceway
  • Narrow site requiring strategical planning as truck movement requiring drive in and drive out access only.